Date: March 30, 2019
March 18 seems to be a good day to start the renovation. So, the renovation of our new place started on March 18, 2019.

The wall on the right side is down.
![]()
Kitchen will be bigger next time.
![]()
Place look slightly bigger with that wall come down. Will keep the door.
![]()
Kitchen seems bigger.
![]()
Washing Area.
![]()
Attic floor untouch.
![]()
Still thinking on all these windows, to change or not to change. My contractor has zero experience changing it. So, still thinking hard.
![]()
Knocking down a few walls.
![]()
Gas pipe is from PUB. so, I think will keep.
![]()
Study room area.
![]()
Will move the roof top balcony door behind, so kids can sit on the stairs and play.
![]()
Guest toilet.
![]()
Room corridor.
![]()
Master bedroom toilet.
![]()
Master bedroom.
![]()
Converting this room to walking wardrobe and store room.
![]()
Will place a small table to put my laptop in this area.
![]()
Kids bed room.
![]()
Kids bedroom toilet.
![]()
Kids bedroom windows.
![]()
Roof top balcony.
![]()
Roof top room.
![]()
Roof top.
![]()
Roof top. Keeping the shelter.
![]()
Designing what to do on the roof top.
![]()
Every week I go and check it.
![]()
This is 1 month later.
![]()
2 more months and it shall be done.