Date: March 30, 2019
March 18 seems to be a good day to start the renovation. So, the renovation of our new place started on March 18, 2019.
The wall on the right side is down.
Kitchen will be bigger next time.
Place look slightly bigger with that wall come down. Will keep the door.
Kitchen seems bigger.
Washing Area.
Attic floor untouch.
Still thinking on all these windows, to change or not to change. My contractor has zero experience changing it. So, still thinking hard.
Knocking down a few walls.
Gas pipe is from PUB. so, I think will keep.
Study room area.
Will move the roof top balcony door behind, so kids can sit on the stairs and play.
Guest toilet.
Room corridor.
Master bedroom toilet.
Master bedroom.
Converting this room to walking wardrobe and store room.
Will place a small table to put my laptop in this area.
Kids bed room.
Kids bedroom toilet.
Kids bedroom windows.
Roof top balcony.
Roof top room.
Roof top.
Roof top. Keeping the shelter.
Designing what to do on the roof top.
Every week I go and check it.
This is 1 month later.
2 more months and it shall be done.